Product data enrichment
Platform architect. I designed and built the process.
At a global manufacturing company, I designed and built a process that writes consistent product names for a large spare parts catalogue in 11 languages.
11
languages, with one consistent way to name a part
about 2%
of the names go to the second model for a review Measured
about 4
person-months if it were done by hand Estimated
How sure am I? Every result and estimate carries one of these labels.
- Measured
- A number that was measured, in production or in a test.
- Estimated
- My best estimate, with the reasoning shown.
- Hypothesis
- What I expect to happen. Not proven yet.
- Illustrative example
- Made up to show how it works. Not real output.
Overall value proposition
This process is for the customers of a global manufacturing company's spare parts web shop. It writes consistent product names for a large spare parts catalogue in 11 languages.
- The problem. Customers order when the name matches the part they are looking for Hypothesis. In the source data, some names are a bare part code, some are abbreviated, and some are in English on a page set to another language.
- The idea. One model writes each name, a second model reviews the ones it is unsure of, and strict rules decide what may be shown.
- The evidence. One full run is very cost-effective; by hand it would take about four person-months Estimated. It is built for the upcoming new web shop, so the business results are still a Hypothesis.
Tier 1
Gemini writes the name
Understands the part, writes a new English name, and translates it into the other languages. Its confidence is measured and reported.
Tier 2
Claude Sonnet reviews
Takes the names where confidence is low, about 2% of all Measured, and reasons more deeply about what the part is.
All other names go straight to the rules.
Tier 3
Strict rules decide
The name has to pass a set of rules. If a supplier's name would be shown, for example, the name is rejected.
- Pass: The name is accepted.
- Fail: The name goes back to the queue, with the reason.
- Always: Reporting watches for failures, inconsistencies and categories that look wrong.
Why this was worth solving
The global manufacturing company's spare parts web shop has a large catalogue in 11 languages. Customers often find the part they need from a blueprint. What tips the decision to order is whether the name matches the part they are looking for.
The original names come from the company's SAP ERP system. In the source data, some names are a bare part code, some are abbreviated, and some are in English on a page set to another language (three made-up examples of these kinds are below). Translated names are not always available, and in some regions, such as Japan, an English base name is much less customer friendly.
About a quarter of the products have a picture, and many have few attributes. With so little else on the page, the name carries most of the trust.
The company tracks the adoption rate: the share of orders placed in the web shop rather than by phone or email into SAP. Manual orders take labour hours. Whether product names affect ordering has not been proven. I treat it as a Hypothesis, and the measures under Value exist to test it.
The effort to do something about the names has changed: what would have been a significant project a couple of years ago no longer is.
This started as my own initiative, within my role as platform architect. It costs little, it adds new paths and does not replace existing integrations or workflows, and going back to the original names would take a matter of hours. The impact looks positive at this moment, but it is not measured yet Hypothesis.
Names, before and after
Before
QF-2290-31B
The name is a code. It does not describe the part.
After
- en
- Cover plate, stainless steel, 3 mm
- fi
- Suojalevy, ruostumaton teräs, 3 mm
Before
BRKT MTG 2 HOLE 6MM STL
Abbreviated and in capitals, in English.
After
- en
- Mounting bracket, steel, 6 mm, 2-hole
- fi
- Asennuskannake, teräs, 6 mm, 2-reikäinen
Before
,OIL FILTER FOR D5500 ACME ENGINE.
In English on a page set to another language, with a comma at the start, a full stop at the end and the engine maker's name.
After
- en
- Oil filter for engine D5500
- fi
- Öljynsuodatin, moottori D5500
The solution and its safeguards
AI is used twice here: as the development tool that built the process, and as the engine inside it.
Before any name is written, the process builds context for each product: the company and its web shop, customer personas, the equipment the spare part is for, a style guide, the main product categories, and the pricing team's rules for that category. Then it works in three tiers.
Each tier keeps one promise.
-
The name says what the part is.
- Tier 1, Gemini. Understands the part, writes a new English name, and translates it into the other languages. Its confidence is measured and reported.
-
Where the first model is unsure, a second model looks.
- Tier 2, Claude Sonnet. Takes the names where confidence is low, about 2% of all Measured, and reasons more deeply about what the part is.
-
The name shows only what may be shown.
- Tier 3, strict rules. The name has to pass a set of rules. If a supplier's name would be shown, for example, the name is rejected and goes back to the queue with the reason.
Language models can still hallucinate, so the quality gates are a must: without them a fully automated flow would risk unwanted results. On top of the tiers, reporting watches for failures, inconsistencies and categories that look wrong. The process is built to production level, across more than one cloud, with monitoring, documentation, repositories and decision gates.
What happens to a name that keeps failing has not come up yet. The plan: the report raises an alert, and the fallback for a new product is the original name from the ERP system.
Options considered, and what was not done
I considered four other ways.
- By hand. About two people for two months Estimated. It is not translation: it means understanding each part and carrying its meaning into 11 languages.
- A machine translator on the existing names. The names contain abbreviations and mixed measurements, which translators handle poorly. The right word for a part, a cylinder for example, depends on how it is used in each language. And a translator cannot apply rules about what a name may show or leave out.
- One model in one pass. One model alone did not meet the quality bar: its confidence in understanding the part was sometimes low. A second tier now handles those cases.
- A manual approval step before names go live. Not feasible. The flow is time-critical. Approving product names is not an existing step in the process, a wait of a week would be too long, and a manual gate would stall the flow within months. Automated checks and reporting do that job instead. The better way is to fix in retrospect, knowing that a few names that need a fix can slip through to the web shop until the reports show them. Even so, the result is significantly better than the names today Hypothesis.
Waiting for the platform's own data clean-up was not an alternative but an input. That work covered data models, categories and attributes, not names, and it made it possible to build category and attribute information into the new names.
Value
It is built for the upcoming new web shop, so there are no results to report. These are the measures I will look at, and each is a Hypothesis until there is data:
- Adoption rate, the headline: the share of orders placed in the shop rather than by phone or email into SAP.
- Conversion: whether customers trust that they will get the correct part.
- Support requests: fewer questions when the name says enough.
- Sales of parts supplied directly by third parties, for example pumps.
A consistent naming scheme, no supplier names and less R&D jargon should also give the shop a more consistent look Hypothesis.
What it costs, as far as I know today:
- One full run of the whole catalogue on GCP is very cost-effective. It has run in full once and in part a few times, and at least one more run is needed.
- Running cost: tens of euros a month Estimated.
- My own time: about one week of work, spread over two and a half months Estimated.
- Everything together: a cost-efficient way to use the right tools and scale the solution to the whole catalogue.
- By hand, it would be about four person-months Estimated.
What comes next
It goes into use with the upcoming new web shop.
I do not see a result that would make me stop. Even if a few names still slip through, the overall result compared with the names today should be much better Hypothesis.
What I am least sure about is not the build. Building is typically the fun and rather easy part. Putting a new practice into daily work, especially one that involves people, is harder: how the teams can review the reports, how to measure the results, and how to adjust the process from data instead of guesses. That is change management, and it starts once the process is in use. The build is mostly done; maintenance is the next piece, and it begins when the process is in production.